Before you commit

Some programmes require an application before contracts, deposits, tenders or project work begin. Applying late can invalidate support entirely.

Tell us about your hotel

Use the source-recorded business-size terms to order the results. This detail stays in this page and is not sent or saved.

What counts as an SME in Singapore?

Enterprise Singapore counts a company as an SME when its group annual sales turnover is no more than S$100 million or its group employment is no more than 200 workers. Many Singapore grants also require at least 30% local ownership by Singapore citizens or permanent residents, based on ultimate individual ownership.

Each programme sets its own criteria, so check the official programme page. Source: Enterprise Singapore EDGE Grant FAQ. Malaysian programmes use their own size thresholds.

The administering body decides eligibility and support. Confirm the full official terms before acting.

Searches the recorded name, agency, support, eligibility, conditions, objectives and keywords.
This reflects the wording recorded from the programme. It does not decide eligibility.
Rolling and unstated deadlines are labelled instead of being presented as dates.

7 of 28 published programme summaries match these filters. Showing 7.

  • GrantOpen

    Accessibility Fund

    Supports accessibility upgrades to eligible existing private buildings.

    Who it may suit: Private owners of existing buildings completed before 1990, or before 2013 where basic accessibility features are already in place.

    What it supports: For qualifying pre-1990 buildings: up to 80% and S$300,000 per building, up to two applications. For qualifying pre-2013 buildings with basic accessibility: up to 60% and S$100,000 per building, one application.

    The public record does not state whether the project may have started. Check the official programme.

    Key condition
    Landed houses, individual units, government-owned buildings, buildings undergoing addition and alteration works, and buildings in a collective sale process are not eligible.
    Deadline
    Deadline not stated
    Last verified
    13 September 2026
  • Development IncentiveClosing Soon

    Built Environment Transformation Gross Floor Area Incentive Scheme

    Provides additional gross floor area for eligible developments that achieve specified built-environment transformation outcomes.

    Who it may suit: Private developments of at least 5,000 square metres of gross floor area, including hotels. Government Land Sales sites launched before 31 March 2022 are eligible for up to 2%.

    What it supports: Up to 3% additional gross floor area; this is a development incentive, not a cash grant.

    The public record does not state whether the project may have started. Check the official programme.

    Key condition
    The scheme runs until 23 November 2026.
    Deadline
    Rolling application; date recorded 23 November 2026
    Last verified
    13 September 2026
  • GrantOpen

    Experience Step-Up Fund (ESF)

    Supports new or enhanced tourism experiences through content, technology, amenities and infrastructure.

    Who it may suit: Eligible legal entities proposing an experience or enhancement with meaningful tourism outcomes.

    What it supports: Project-specific co-funding; no single universal rate is stated on the public page.

    The recorded terms require an application before the project starts.

    Key condition
    Do not commence, contract or make payment before application.
    Deadline
    Rolling application
    Last verified
    13 September 2026
  • GrantOpen

    Green Mark Incentive Scheme for Existing Buildings 2.0 (GMIS-EB 2.0)

    Supports energy-performance upgrades for qualifying existing privately owned buildings, including hotels.

    Who it may suit: Existing private buildings of at least 5,000 square metres; hotels are explicitly included among eligible building types.

    What it supports: Lower of 50% of qualifying cost or S$600,000 for Green Mark Platinum, S$900,000 for Super Low Energy and S$1.2 million for Zero Energy.

    The recorded terms require an application before the project starts.

    Key condition
    Available until funds are fully committed or 31 March 2027, whichever is earlier.
    Deadline
    Rolling application; date recorded 31 March 2027
    Last verified
    13 September 2026
  • GrantOpen

    Hotel Rejuvenation Fund (HRF)

    Supports comprehensive hotel refurbishment combining product enhancement, operational productivity and sustainability.

    Who it may suit: Singapore-registered hotel with a valid Hotels Licensing Board licence.

    What it supports: For applications approved by 31 March 2027: product-enhancement and productivity components up to 50% for SMEs and 30% for non-SMEs; sustainability component up to 70% for SMEs and 50% for non-SMEs.

    The recorded terms require an application before the project starts.

    Key condition
    Minimum total project cost is S$3 million.
    Deadline
    Rolling application; date recorded 31 March 2027
    Last verified
    13 September 2026
  • GrantOpen

    Orchard Road Rejuvenation Initiative (ORRI)

    Supports new building façade enhancements, experiential concepts and night-time initiatives that add vibrancy to the Orchard Road precinct.

    Who it may suit: Any legal entity, including businesses and associations, with a project in the Orchard Road precinct (Tanglin, Orchard, Somerset and Dhoby Ghaut). Sites just outside the boundary are assessed case by case.

    What it supports: Up to 70% of eligible third-party project costs, subject to STB assessment. There is no minimum project value.

    The recorded terms require an application before the project starts.

    Key condition
    Phase 1 applications close on 30 November 2026. STB will announce any later phases.
    Deadline
    30 November 2026
    Last verified
    14 September 2026
  • GrantOpen

    Tourism Product Development Fund (TPDF)

    Supports the creation or major rejuvenation of tourism products that strengthen visitor appeal and spending.

    Who it may suit: Legal entities developing a qualifying tourism product with measurable international-visitor outcomes.

    What it supports: Project-specific. Pure refurbishment without meaningful content or experience refresh is generally not the intended use.

    The recorded terms require an application before the project starts.

    Key condition
    The product should attract international visitors and expenditure.
    Deadline
    Rolling application
    Last verified
    13 September 2026

Context

Read the support against the market

Occupancy and rate tell you whether a project needs support to work, or whether the market is already carrying it.

How Singapore hotels are trading

Official statistics from the same publication that drives the rest of this site. See the full hotel performance series.

Singapore hotel performance

  • Hotel occupancy rate

    91.2%

    Aug 2026

    • On a year earlierup 1.6 percentage points on a year earlier
    • On the previous monthdown 0.1 percentage points on the previous month

    Source: Singapore Department of Statistics

  • Average room rate

    S$284.40

    Aug 2026

    • On a year earlierup 3.5 per cent on a year earlier
    • On the previous monthup 2.0 per cent on the previous month

    Source: Singapore Department of Statistics

Keep exploring

Explore more of Market Intelligence

Talk to us

Ask about a programme

Corrections, a source we have missed, or a question a page did not answer. We reply by email.